TEST REPORT FOR LOCAL CONTROL PANEL
(ZQ-QR-0816)
CUSTOMER:
Panel No. : Date:Drawing No. to be applied:
Test Procedure1. Mechanical check and visual inspection(1)Inspection for physical damage/defects(2)Check name plate information for correctness(3)Check tightness of all bolted connections(4)Check quality of paint work2. Control wiring check(1)Checking for every wiring according to wiring diagram.3. Insulation resistance test (by 500V megger)(1)Between CT circuit and ground,(2)Between DC circuit and ground,(3)Between AC circuit and ground,Results……satisfactory……satisfactory……satisfactory……satisfactory……satisfactory……satisfactoryMore than 50MΩMore than 50MΩMore than 50MΩTemperature…… ℃Humidity………. %4. Dielectric testApply test voltage 2000V, 50Hz for one minute.(1)Between DC, AC circuit and ground.5. Control circuit test (sequence operation test)(1) DC circuit testOn the basis of the sequence diagram, control circuit, lampcircuit, alarm circuit and other circuit are confirmed.(2) AC circuit testOn the basis of the sequence diagram, heater circuit, interiorlamp circuit, and other circuit are confirmed.……satisfactory……satisfactory……satisfactoryTEST BY: CHECKED BY:
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- yrrf.cn 版权所有 赣ICP备2024042794号-2
违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务