8. Tooling1Tooling Fabrication1.1Does the mech sub-tier has the capability to fabricate toolings (metal & plastic)?有模具管理团队吗?1.2Is it the Mech sub-tier supplier or the ODM supplier who owns the toolingdevelopment, fabrication and production when a tooling is outsourced to a thirdtooling factory? 它是sub-tier机械供应商或ODM供应商谁拥有模具开发,制造和生产工具是外包给第三个工具的工厂吗?1.31.3If a tooling is provided by third-party, is there an effective & executable recoverplan for tooling issue, including issue owner determination process, tooling repaircycle time target & maintenance plan?有一个有效的和可执行的恢复计划工具问题,包括问题确定流程所有者、模具维修周期时间目标和维护计划?Before tooling kick off, is there a process about design review to avoid potentialrisk on tooling?工具启动之前,有一个关于设计评审过程,以避免潜在的风险工具吗?Is life cycle defined for each tooling ? Is any matrix & criteria defined about toolinglife cycle, like tooling material verification, tooling structure verification?是生命周期定义为每个工具吗?是任何矩阵和定义的标准工具生命周期有关,如模具材料验证,模Is there a procedure in place to require specific evaulation to specially evaluate the tooling while the tooling run out of life cycle?是否有一个程序在地方的工具而工具耗尽了生命周期?Do the tooling get verified after each pilot run, including FAI & CPK measurement?做工具得到验证每个试点运行后,包括固定资产投资和CPK测量?Is tooling modification recorded during NPI stage?是工具修改记录在NPI阶段吗?Is there tooling qualification process & Tf criteria in place? Are FAI, Cpk, capacityevaluation & FPY review included?有工具资格过程& Tf标准到位?是FAI Cpk、能力评价和FPY审查包括吗?Tooling performance工具性能
Is there any index to measure tooling performance?有没有指数衡量工具性能?Is there a goal defined for tooling performance?有一个目标定义工具性能?
Is there a specific data collection system defined to measure tooling performance ?有一个特定的数据采集系统定义的测量工具性能?Do the tooling performance weekly and monthly reported and reviewed ? And isthere CLCA in place if the actual tooling performance fall of goal ?做工具性能每周、每月的报道和复审?和有CLCA在实际的工具性能下降的目标吗?
1.41.51.61.71.844.14.24.34.4