The flow chart of 50000m3 plywood product in sino-panel
3
(1)
原木log木段剥皮log barking2截断cutting(3)调湿heating the block4旋切rotary cutting5剪裁分选veneer grading andveneer clipping9剪裁配板6单板预干veneerpredrying(8)单板修补veneer patching7整平干燥drying(14)一次预压prepressing13一次组坯lay up12一次涂胶glue spreading(11)单板搭接lap jointing(10)单板磨头veneer edge ofsanding19二次涂胶glue spreading20二次组坯lay upveneer clipping andveneer grading21二次预压prepressing15二夹板修补patching16一次热压hot pressing17二夹板精修repairing18一次砂光sanding(22)合板修补repairing28打包入库receipt
27检验分等quality inspection
and classity
26齐边trimming
25二次砂光sanding
24合板精修repairing
23二次热压hot pressing审核:校核:编制:
因篇幅问题不能全部显示,请点此查看更多更全内容