Installation Manual for GCL
Content
Chapter 1 Safety Instructions ......................................................................................................... 2Chapter 2 Preparations for installation ............................................................................................ 3Chapter 3 Installation Process ........................................................................................................ 4Chapter 4 Layout ............................................................................................................................ 7Chapter 5 Installing the support ...................................................................................................... 8 Chapter 6 Installing the angle steel................................................................................ …………10 Chapter 7 installing the rails .........................................................................................................12 Chapter 8 Installing the rails supporting the modules ................................................................... 13 Chapter 9 Installing the modules………………………………………………………………………...14 Chapter 10 Commissioning of the installations………………………………………………………...15 Annex Installation drawing ………………………………………………………………………………20
Chapter 1 Safety Instructions
1.1 Safety instruction
This equipment can only be installed and maintained by professional persons whom have been trained.
During the installation and the maintenance of this equipment, safety regulations and relevant local laws and regulations must be followed, if not, dangerous or damages to the equipment may occur. The safety instructions mentioned in this manual is the supplement to the local safety laws and regulations.
Any injuries or damages resulting from breaching the safety instructions and the safety norms governing the designing, production and usage of the mounting systems should not be regarded as our responsibilities.
Chapter 2 Preparations for installation
Abstractor
This chapter introduces the surrounding environments necessary to the installation and the checking process when the packaging boxes are opened.
2.1 Checking the surrounding environments
The items regarding the surrounding environments necessary to installations are as follows:
2.1.1 Checking the ground
Verify the layout of the places where the mounting systems are located, and to check whether the infrastructure in question can meet the demands of installation.
Verify the layout of the places where the mounting systems are located, and to check whether the infrastructure in question can meet the demands of installation.
Verify the layout of the places where the mounting systems are located, and to check whether the infrastructure in question can meet the demands of installation.
2.1.2 Preparation of tools
Check whether the tools necessary to the installations can meet the demands.
2.2 Preparation for the technical materials
Check whether the technical materials necessary to the installations are in comply with each other. Those materials include Installation Manual and Installation Drawing.
2.3 Checking the goods
2.3.1 Procedures of opening the box
Methods and Procedures:
1) Move the upper cover of the box by loosening the connections between the upper cover and the side parts of the box. 2) Move out the components with gloves.
2.3.2 Checking
1、 Check and note whether the packaging box is damaged or not. 2、 Open the packaging box according to the procedure mentioned in 1.5.1 3、 Check the goods according to the packing list attached to the packaging
box.
4、 Check whether the goods inside the box is damaged or not. Goods
damaged can be replaced by the spare parts in the box, and one can get the replacement from us. 5、Note the checking results.
The Checking reports should be signed both by Wellkey and the end users, and should be returned to Marketing Department and Engineering Department of Wellkey.
Chapter 3 Installation Process
Abstractor
This chapter introduces the detailed procedures for the installation of Ground station mounting systems.
3.1 Installation Procedures
Detailed installation procedures are as follows:
Define the position where the support will be installed---Installing the support----Installing the angle steel(80x50) and angle steel(50x50)---Installing the rails--- Installing the rails supporting the modules--- Fastening the PV modules ----inspection
3.2 Define the installation size
Introduce in details the size of the layout. See relevant information in chapter 4.
3.3 Brief introduction to the installation of the support
Introduce in details the layout of support and their installing procedures. See relevant information in Chapter 5
3.4 Brief introduction to the installation of angle steel 80x50 and 50x50
Introduce in details the layout of angle steel 80x50 and 50x50 and their installing procedures.
See relevant information in Chapter 6.
3.5 Brief introduction to the installation of the rails
Introduce in details the layout of profiles and the installing procedures. See relevant information in Chapter 7.
3.6 Brief introduction to the installation of the rails supporting the modules
Introduce in details the layout of the rails—supporting the modules and their installing procedures.
See relevant information in Chapter 8.
3.7 Brief introduction to the fastening of PV modules
Introduce in details the fastening methods and procedures of module. See relevant information in Chapter9.
3.8 Checking after installations
Introduce the methods and procedures for this part. See the relevant information in Chapter 10.
3.9Attentions during installation
1、 Read carefully the relevant drawings and installation manuals before
installation.
2、 Safety instructions and installation procedures should be followed so as to
ensure safety.
3、 Checking the assembly size after the installation.
Chapter 4 Layout of the mounting system
Abstractor
This chapter introduces the layout of the mounting system.
4.1 Defining the position where the support will be installed.
4.1.1 Defining the size of the position where the support will be installed.
1) Define the base location of the installation and draw a line to confirm. 2) Define the installation position based on the assembly drawing.
图4-1 The size of the installation of modules
Chapter 5 Installing the support
5.1 Specifications of the support
Support: 10# channel steel
5.2 Installing Procedures
1) Installing the support by using pile driver based on the line drew defining the position of support.
2)Because of the complicated geographic conditions, pressure need to be set before driving a pile (this pressure should make sure that the support can be put into the earth smoothly under normal geographic conditions without any damage even when the support heat stones or other hard stuffs,) Other treatment to the earth will be needed when the support cannot be put into the earth with certain pressures. 3)Schematic diagram of installation:
Chapter 6 Installing the angle steel
6.1Specification of the angle steel
80x50 50x50
6.2Installation Procedures
1) Connecting the inclined strut and the support; 2) Screwing the bolt with wrench.
3) Checking the installation size according to the drawing, and make sure that the support and the inclined strut are tightened together.
Chapter 7 Installing the rails
7.1Specification of the rails
80mm×30×1.6 bended steel
7.2Installation Procedures
1)Connecting the support, rails and the inclined struts. 2) Screwing the bolt with wrench.
3) Checking the installation size according to the drawing, and make sure that the support and the inclined strut are tightened together.
Chapter 8 Installing the rails—supporting the modules
8.1 Brief introduction to the rails—supporting the modules
Specification:41mm×41mm×1.50mm
8.2 Installation Procedures
1) Connecting the rails by using screw bolts. 2) Screwing the bolt with wrench.
3) Checking the installation size according to the drawing, and make sure that the support and the inclined strut are tightened together.
Chapter 9 Fastening the modules
9.1 Specification of the modules:
1580mm×808mm×50mm
9.2Installing procedures
1) Put the modules horizontally on the profiles
2) Checking the installation size and then fasten the modules by using
clamps and screw bolts.
Chapter 10 Commissioning of the installation
Overview the system after installation, including the size, and the mechanical stability. And this part should be carried out according to the installation drawings.
Annex: Installation Drawing:
Mounting System
WK-GCL01